Construction & Technology
Once the Functional Design is approved and we agree on the details, about:blank draws up a Technical Design. Since there is a fair chance that such a Technical Design is only fully comprehended by nerds, we make sure to develop the Functional Design (FD) prior to the Technical Design (TD).
Once the TD fits the FD, we enter the next project phase: the construction of the application. We’ll test various modules in the construction phase and once we are completely satisfied with the results, we’ll deliver a prototype. After you have checked and approved the prototype, we’ll deliver the final and complete application.